Hi Community,
i am new in HP 5120 Switches and have a question to configure 3 esx Server with two 5120 Switches.
How do i have to configure the Switches to connect the esx Server to both switches?
what is the right way to stack the Switches or have i to configure a Cluster or anything else?
with other HP Swiches i cinfigure a trunk between the Switches, thats all but with the HP 5120 that do not work.
I search for best practice manuals or something else, but can not find exact information about the Configuration.
is there anyone who can help ??
thank you
Michael